Contact Us For Floor Screed Supplies In Dorset
Free Quote
Contact
Phone
Address
Poole
Dorset
BH15 2AR
We supply and install liquid screed in and around the following areas:-
Dorset
Poole, Bournemouth, Christchurch, Blandford Forum, Shaftesbury, Wareham and Weymouth.
Hampshire
Ringwood and the west side of the New Forest, New Milton and Lymington areas.
Wiltshire
Salisbury and the surrounding area.
Even if your area isn’t shown here we may well be able to help supply and install your liquid screed, so please just ask!
Self-Levelling Floor Screed Aftercare
How long until the screed is set?
Light foot traffic after 24-48 hours.
Drying Time
After 24 hours open all doors & windows to allow moisture to escape. This needs to be done every day, to give your floor the best chance to dry out before it receives floor coverings.
As a guide liquid screed dries at 1mm per day up to 40mm, and 0.5mm per day over 40mm.
Can I Use A Dehumidifier?
After 72 hours dehumidifiers can be used to help the drying out process.
Cracked screed? Don’t worry!
Do NOT be worried if you see any cracks appear in the screed , it’s just the laitance forming. This is a 1mm film that sits on top of the screeding which will need removing.
After 48 hours – 72 hours try removing the laitance with a plasterer’s floor scraper and a stiff brush. It comes off very easily if done at the right time.
When Can I Turn On Underfloor Heating?
Underfloor heating can be turned on gently after 7 days, turning it up 5 degrees a day up to maximum, then the same in reverse back down to zero degrees.
When Can Floor Coverings Be Put Down?
Before the floor receives any floor coverings you must do a moisture test with a hygrometer. The reading MUST be below 75% RH.
What About Primers?
Liquid screed needs to be primed prior to any application of adhesives. Adhesives MUST also be compatible with an anhydrite screed.
Please consult adhesive manufacturers for advice before application.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.